1. Spent much of the day planning the location and mounting schemes for almost all of the electrical items in the airplane. Assembled the entire avionics rack and temporarily installed it to check the fit and begin some detailed wire planning. I had to do some serious on-the-fly engineering on my annunciator adapter box in order to figure out how to mount it.
2. Continued working on instrument panel and subpanel planning with my awesome panel guy, Joe. He is finalizing the cut files so I can get the panels water-jetted.